AHU Replacement
Ft. Rucker, Alabama
Coordinated the design and managed the replacement of 12 air handler units in an operational 1950's era research facility.
U.S. Federal Bureau of Prisons -- Field Acquisition Office
Building #346 Addition & Flooring Replacement
Grand Prairie Army Reserve Base, Texas
Constructed a 3-story addition to a functioning processing center. Building consists of several training rooms and additional open and private office spaces to support ongoing operations.
Walter Reed Army Institute of Research (WRAIR)
Building #501 Mechanical and Electrical Upgrades
Silver Spring, Maryland
Replaced non-functional emergency electrical generator, switchgear, and AHU servicing sensitive storage area for a research labs.
Walter Reed Army Institute of Research (WRAIR)
Building #511 HVAC Repair
Silver Spring, Maryland
This job took place in an Animal Housing Facility used primarily for medical research. DMCA performed a renovation of the Central Utility Plant which required the replacement of two 250 ton chillers and one 500 ton cooling tower. This job was funded by the American Recovery and Reinvestment Act.
Walter Reed Army Institute of Research (WRAIR)
Building #503 Chiller Replacement
Silver Spring, Maryland
Increased chiller capacity from 3,300 tons to 6,000 tons and renovated existing control system. Installed three 2,000 ton chillers and associated mechanical systems.
Walter Reed Army Institute of Research (WRAIR)
Building #163 Rooftop Package Replacement
Silver Spring, Maryland
Created Type 2 Work Plan and replaced ductwork, diffusers, VAV boxes, and installed 30-ton rooftop cooling unit.
U.S. Army -- Aberdeen Proving Ground
Replace Cooling Towers
Aberdeen Proving Ground, Maryland
Repaired, cleaned and refurbished two cooling towers at Aberdeen Proving Ground.